Key investments in Poland and abroad

Presented below is the Group’s capital expenditure, excluding repairs of components and catalysts, but including advances paid and settled.

Structure of capital expenditure:

LOADING


Pozycjaprocent
Business development53.7%
Business maintenance29.9%
Mandatory investments9.7%
Purchase of finished goods6.7%

Business development

487 228 PLN

Business maintenance

271 289 PLN

Mandatory investments

88 165 PLN

Purchase of finished goods

60 108 PLN

Capital expenditure at the Grupa Azoty Group in 2015:



Parent PLN 256,756 thousand
Grupa kapitałowa Grupy Azoty KĘDZIERZYN PLN 263,309 thousand
Grupa kapitałowa Grupy Azoty POLICE PLN 212,066 thousand
Grupa kapitałowa Grupy Azoty PUŁAWY PLN 153,773 thousand
Grupa Azoty SIARKOPOL PLN 8,278 thousand
Grupa Azoty PKCh Sp. z o.o. PLN 7,886 thousand
Grupa Azoty KOLTAR Sp. z o.o. PLN 3,076 thousand
Grupa Azoty ATT Polymers GmbH PLN 1,646 thousand


Project name Project budget Expenditure incurred Expenditure incurred in 2015 Project description Scheduled completion date
Polyamide plant II 80 thousand t/y 320,000 88,221 85,896 To utilise the Group’s caprolactam output in a more efficient manner 2016
Granulation plant II 141,000 41,204 35,672 To optimise the mix of fertilizer products and improve value added in ammonium sulfate 2016
Bulk fertilizer storage facility 43,000 42,967 32,347 To season and store in appropriate conditions Saletrosan® 26 Makro (macro granules ASN) and Saletrzak 27 Makro (macro granules CAN) 2016
(currently in the start-up and testing phase)
Intensification of cyclohexanone manufacturing from phenol 25,750 19,168 18,765 To reduce the cost of producing cyclohexanone from phenol and increase cyclohexanone output 2015
(completed)
New iron-chromium catalyst plant 27,700 3,001 2,851 To scale up business growth in the catalyst segment, further improve the catalyst quality, create expansion opportunities, and increase the customer base 2016
Increase in ammonia production capacities 44,500 4,306 4,139 To increase the Group’s own output of ammonia by ca. 100 t/d 2016
Flue gas desulfurization unit 45,400 11,167 10,794 To reduce sulfur dioxide and dust emissions from CHP Plant’s Boiler No. 5, meet the emission standards laid down in the IED Directive, and ensure the continuity of power and heat production 2016
Flue gas denitrification unit 44,600 17,205 16,832 To reduce NOx emissions from CHP Plant’s Boiler No. 5, meet the emission standards laid down in the IED Directive, and ensure the continuity of power and heat production 2016
20 MW pass-out and condensing turbine generator set at the CHP Plant 63,000 33,557 25,462 To optimise the loads of the existing back-pressure turbine generators 2016
Construction of a new technical-grade nitric acid storage unit − Phase 1 15,000 269 269 To replace the existing worn out technical-grade nitric acid storage unit with a new one 2017


Project name Project budget Expenditure incurred Expenditure incurred in 2015 Project description Scheduled completion date
New CHP Plant at Grupa Azoty KĘDZIERZYN −
Phase 1
375,059 199,651 134,102 To restore the plant’s electricity and heat generation capacity, increase its output to satisfy demand for electricity and heat, and implement solutions that ensure compliance with the growing environmental requirements 2016
Launch of continuous production of OXOVIFLEX™ 42,300 42,031 11,448 To construct and launch an OT terephthalate unit with an annual capacity of 50 thousand tonnes Completed and placed in service
Logistics base for UAN-type liquid fertilizers with added modifiers 20,800 15,301 15,247 To store and maintain quality parameters of UAN-type liquid fertilizers, as well as the distribution of the fertilizers stored Completed
Upgrade of the urea unit 23,181 2,028 1,056 To reduce the unit’s environmental impact, obtain additional production capacity and increase process efficiency 2016
Replacement of the interior of the ammonia synthesis reactor 18,500 16,148 12,160 To increase ammonia production capacity, reduce pressure at the synthesis loop and mitigate the risk of failures Completed and placed in service
Alteration of the roof of the fertilizer storage facility 22,080 21,437 20,972 To alter the roof of the bulk fertilizer storage facility to protect fertilizers against adverse weather conditions and to improve health and safety at work Completed and placed in service


Project name Project budget Expenditure incurred Expenditure incurred in 2015 Project description Scheduled completion date
Propane Dehydrogenation (PDH) unit and related infrastructure 1,675 000 32,606 32,606 To construct a Propane Dehydrogenation (PDH) unit with a planned annual output of at least 400,000 tonnes of propylene; in addition to the PDH unit, a power generating unit will be constructed and a chemicals terminal will be built at the Police port facilities 2019
Exhaust gas treatment unit and upgrade of the EC II CHP plant 163,700 134,635 25,026 To bring the operation of the CHP plant’s units in line with the requirements of Directive 2010/75/EU 2016
Upgrade of the ammonia unit 155,600 67,574 61,345 To reduce energy consumption of the ammonia production process and to improve the operational reliability of individual process nodes 2016
Change of the phosphoric acid production method 67,000 2,719 2,719 To raise the efficiency of phosphoric acid production and improve the acid’s quality by reducing impurities and waste generation 2017


Project name Project budget Expenditure incurred Expenditure incurred in 2015 Project description Scheduled completion date
Production of solid fertilizers based on urea and ammonium sulfate 137,500 134,495 36,102 To enable the production and sale of new solid fertilizers PULGRAN / PULGRAN S (160,000 tonnes per year) and to construct a new logistics and distribution complex Completed and placed in service
Facility for production of granulated fertilizers based on ammonium nitrate 385,000 8,906 8,906 To improve the quality of fertilizers by applying modern mechanical granulation 2020
Construction of the Puławy Power Plant 1,125,000 4,633 4,633 The key function of the power plant (CCGT unit) will be high-efficiency cogeneration of heat to be used for technological/heating purposes and electricity 2019
Upgrade of the existing nitric acid unit and construction of new units for nitric acid, neutralisation and production of new fertilizers based on nitric acid 695, 000 62 62 To raise the efficiency of nitric acid production and to improve the economics of production of nitric acid-based fertilizers 2021
Replacement of the TG-2 turbine generator set 99,000 321 64 To increase the efficiency of electricity and heat cogeneration by replacing the TG-2 30 MWe pass-out and condensing turbine with a new turbine with a rated input of 37 MWe as part of the power system upgrade 2017
1,900 Nm3 hydrogen compressor 12,500 10,861 10,826 To improve operational stability of the units, bring down the failure rate and reduce hydrogen consumption rates 2016
NOx reduction units at two boilers at the CHP plant 16,000 12,044 1,538 Air protection Completed


Project name Project budget Expenditure incurred Expenditure incurred in 2015 Project description Scheduled completion date
Construction of sulfur pastillation unit 25,000 21,156 4,369 To manufacture a new product – dewatered sulfur pastilles Completed and placed in service
Purchase of land plots for production in the areas 7R, S-1, S-2, S-3, Jezioro Osieckie lake 17,500 1,785 1,374 To ensure access to new areas of the deposit 2018
Upgrade of the insoluble sulfur unit SN II 19,000 258 258 To ensure access to new areas of the deposit 2016
cras wytłumaczenie słowa cras